The last month has been a busy one at Bethel Farm as construction continues to progress. Everyday it seems there is something new completed and more checkmarks on our to-do list.
As I've mentioned before, there are inspections all along the way. These last several weeks we have passed wall, electrical, mechanical, plumbing, and chimney footing inspections as well as having our septic system installed. Up next is the insulation inspection followed by drywall installation.
The amount of insulation is CRAZY and it has completely changed the sound when you walk in the barn. It definitely sounds more like a house now.
Once the footings were poured for the chimney the masons got busy. It's amazing to watch these guys work! Brad laughs at me because I'm so mesmerized by the process, but my creative side would love to get in there and learn from them.
Altogether the chimney will house three fireplaces, two on the lower level (one in the master suite and one outside on the patio) and one on the main level in the great room.
The firebox in the great room is tall enough that I can stand up in it!
The brick will be covered in a stone facade and a reclaimed wood mantle.
We can hardly wait to have our first fire.
For my part, the last several weeks have involved lots of design decisions, internet orders, furniture orders, cabinet choices, tile choices, lighting choices, etc. I still have much to do but the list is certainly getting shorter.
Along with all the changes and progress at the barn we have been blessed with one extra special addition to Bethel Farm.
Our first grandchild Callyn Clare Boyles was born May 20 and she definitely rules the roost!